20 Grafton Street

We are here to answer any question you may have.

20 Grafton Street

The old adage of a job well done certainly rang true for General Demolition on Grafton Street.

A few months after completing works at a neighbouring address, we were back in this prestigious area of London’s Mayfair. This time around, it was to undertake enabling works at no. 20 for another client ahead of a refurbishment.

Professional Team:

W.RE / Knight Frank / Blackburn & Co

Programme duration:

10 weeks

Value:

Up to £750k

In summary

Photographic condition and building services surveys

Extensive tag and trace work

Isolation and degassing of MEP services

Installation of temporary supplies incl. wireless fire alarm system

Installation of loading gantry

Soft strip to 8x floors

Removal of plant at roof level

Removal of 2 x passenger lifts

Removal of arisings

Retention of RAFs

Structural and intrusive investigation works

Measured survey / FI works

Setting a new tone

General Demolition was asked to strip out 20 Grafton Street both above and below the ground floor where luxury interior designer, Holly Hunt, remained operational. A refurbishment scheme would follow, adding multiple external terraces including one at roof level which currently housed a large amount of plant (and not the calming green kind).

London was abuzz when the team began on site in May 2023. A new King. Two back-to-back bank holiday weekends. And the start of a new GD project. We know which we were most excited for.