Occupying a coveted corner plot, 21 Bloomsbury Street sits a stones throw away from the British Museum and its wonderfully tranquil reference library.

The 19th century office building sat vacant when General Demolition was drafted in to undertake enabling works in three phases.

Our long sentence was extended with several additional packages of work.

Professional team:

Morgan Capital / Gleeds

Programme duration:

40 weeks

Value:

Over £750k

In summary

Isolations and decommissioning of M&E services

Isolation of temporary supplies

Geotechnical and superstructure investigations

Full strip out of building

Slab infills and opening up works across 6 floors

Removal of multiple lifts

Installation of perimeter scaffold and hoist

Removal of roof plant

Internal demolition on multiple floors

Demolition of roof and glass atrium

Additional opening up works

Additional removal of blockwork and concrete sections and screed

Fire protection

The project

A sustainable approach

Planning consent for the 85,000 sqft office building was granted in early 2023 as the project was unfolding. A full refurbishment and two-storey extension will transform the building, with sustainability at the centre of the redesign. Once complete in Q4 2024, 21 Bloomsbury Street will be one of the UK's most sustainable office buildings..

Works were split into three phases to comply with Camden Council planning consents.

Operating strictly within these parameters, General Demolition undertook strip out, demolition and enabling works across all seven storeys as well at roof level.